Snowy AI
1348 hm³
1373 hm³
98.18%
Subida+171.00 hm³
+12.45%
Al ritmo actual, alcanzara nivel lleno (100%) en aproximadamente ~1 semana
Capacidad energetica
239.00 GWh
Produccion actual
234.00 GWh
Mequinenza
| Fecha | Volumen | Capacidad | Llenado | Variacion |
|---|---|---|---|---|
| 24/5/2016 | 1377 hm³ | 1534 hm³ | 89.77% | |
| 17/5/2016 | 1456 hm³ | 1534 hm³ | 94.92% | +5.15% |
| 10/5/2016 | 1310 hm³ | 1534 hm³ | 85.40% | -9.52% |
| 3/5/2016 | 1341 hm³ | 1534 hm³ | 87.42% | +2.02% |
| 26/4/2016 | 1340 hm³ | 1534 hm³ | 87.35% | -0.07% |
| 19/4/2016 | 1381 hm³ | 1534 hm³ | 90.03% | +2.67% |
| 12/4/2016 | 1431 hm³ | 1534 hm³ | 93.29% | +3.26% |
| 5/4/2016 | 1389 hm³ | 1534 hm³ | 90.55% | -2.74% |
| 29/3/2016 | 1413 hm³ | 1534 hm³ | 92.11% | +1.56% |
| 22/3/2016 | 1343 hm³ | 1534 hm³ | 87.55% | -4.56% |
| 15/3/2016 | 1344 hm³ | 1534 hm³ | 87.61% | +0.07% |
| 8/3/2016 | 1372 hm³ | 1534 hm³ | 89.44% | +1.83% |